|
Western Region
Jaipur, VaishaliNagar, Rajasthan
The major activities that are going on in this region are:
a) Capacity building of villagers and forest field staff under World Food Programme at Udaipur Forest Circle
Objective of the study:
- Develop the capacity of the Community Development Workers under World Food Programme to ensure the long term goal of Human Development through Natural Resource Management.
- Capacity building of the community members especially women to bring desired change in the condition of their health, education and resource base through formation of women Self Help Groups.
- Capacity building of the group members for preparation and implementation of microplans for sustainable Natural Resource Management.
- Integration with Panchayati Raj Institutions for institutionalization of the programme.
- Developing linkages with the line departments.
- Developing indicators and mechanism for participatory monitoring.
- Documentation of the whole process.
After IBRAD’s intervention the following visible changes were seen in the area:
| Division |
Range |
Name of Village |
Unique feature/ visible change brought in the village |
| Udaipur Central |
Dewla |
Gura |
Deepened a village well voluntarily and installed water pulling system on their own cost |
| Kotra |
Soundraf |
Implemented Kulhadi Bandh in the forest |
| Kotra |
Buria |
Villagers have dug a large well voluntarily |
| Kotra |
Nayabas |
Constructed a platform at bus stand |
| Banswara |
Pipalkhun |
Jaithaliya |
Initiated vermicomposting |
| Pipalkhunt |
Sobniya |
Repaired road, hand pump and fencing wall |
| Pipalkhunt |
Narukakhera |
Deepened well & water reservoir for cattle |
| Ghatol |
Dungripara |
Started vermicomposting |
| Ghatol |
Mudasel |
Repaired a handpump |
| Pratapgarh |
Pratapgarh |
Pandwa |
Started vermin composting |
| Pratapgarh |
Gamda |
Repaired temple & involved in immunization of children |
| Pratapgarh |
Datiyar |
Constructed 2 wells in forest area |
| Dungarpur |
Bichhiwara |
Khajuri |
Repaired fencing wall surrounding forestland |
| Bichhiwara |
Gundikua |
Initiated adult literacy |
| Bichhiwara |
Dhamod |
Repaired the check dam |
| Chittor Wild Life |
Dhariyabad |
Mundla |
Started vermin composting |
| Dhariyabad |
Dabela |
Repaired road |
| Dhariyabad |
Ambaratti |
Repaired road and deepened well voluntarily |
| Dhariyabad |
Rana |
Repaired road and deepened well voluntarily |
| Chittor Territorial |
Jawda |
Sangwa |
Constructed a cement platform |
b) Workshops and training on Combating Desertification
A training programme was conducted in Jodhpur and Sikar on combating desertification. A total of 40 participants were present
for the training. The training was conducted with the following objective which was successfully achieved during the time frame.
Objectives of the training programme:
- To develop concepts of combating desertification
- Methods of involving people in combating desertification
- Preparation of management plan
- Developing participatory monitoring indicators
Field Demonstration on the methods of community involvement.
|